The background of the case of flexible vision guided robot cold bonding forming line is the middle section process of sneaker gluing in Skechers OEM, Adidas Indonesia OEM, and Li Ning OEM. Including modeling registration, sole and upper gluing, and a complete set of automated processes for applying treatment agents to ensure product consistency. Technical features: About 5-10 minutes to complete the new product introduction; Complete the spraying work of one shoe in an average of 12-15 seconds; 3D vision and robot automatic planning, suitable for various products.
2023/03/27 fanstek 11
Change the discrete operation mode to an assembly line operation mode to reduce the production cost of shoe lights.
2023/03/27 fanstek 7